Industrial networking and IT/OT service

Factory Network Infrastructure and OT Survey

Before any investment, we record on site which PLCs, switches, protocols and data flows are in use. We list gaps and common points of failure and determine which work should be done first.

Asset inventoryNetwork mapProtocol analysisRisk listRoadmap

Your situation

What problem does this service solve?

Investing without knowing what is there

Quotes and budgets prepared without knowing how many PLCs there are, which firmware is running or how the network is built get revised halfway through the project.

Lost knowledge

The integrator that did the project has changed, the documents are out of date and the knowledge lives in a few people’s memories.

Unclear priorities

Network renewal, security or data collection? Nobody knows which should come first.

Being unable to compare quotes

Each supplier bases its quote on different assumptions. The quotes cannot be compared.

Technical framework

What we cover, and within what limits

An OT infrastructure survey means identifying the plant’s control systems, networks, communication protocols, data flows and the associated risks on site, using controlled methods. No changes are made to the control program or running configuration during the survey. Information is gathered through interviews, an on-site review, existing records from network devices and traffic observation. Reading from existing records, a new port mirroring configuration and a physical TAP installation are separate operations; the preparation and production impact of each are assessed separately. Active scanning is not used by default: an old PLC’s communication module can lock up from an unexpected scan. If needed, it is planned separately and submitted for approval. The output is an impartial assessment that sets the scope and priorities of the next project and can also be used with another implementer. At the end of the survey, the inventory, topology, open questions and priority findings are handed over.

Technical scope

Stakeholder interviews

Interviews with the production, automation, maintenance and IT teams about goals, problems and planned investments.

Asset inventory

PLCs, HMIs, drives, remote I/O, switches, gateways, servers and engineering workstations; model, firmware and location.

Network and topology

Physical and logical network structure, connection points with IT, remote access paths.

Protocols and data flow

Which system talks to which, with which protocol; existing data collection and integrations.

Risks and findings

Findings regarding continuity, security, maintenance and documentation; prioritised by impact and likelihood.

Roadmap

Quick wins, projects and dependencies; a draft scope for the next step.

Methods used in the survey

MethodWhat does it provide?Preparation and production impact
Interviews and document reviewGoals, known problems, existing projectsNo network connection; requires the time of the people involved
Site and cabinet reviewPhysical layout, labelling, environmental conditionsDone with an escort; if cabinets need to be opened, this is planned according to the plant’s occupational safety rules
Reading from existing switch recordsConnected devices, VLANs, port status, topologyNo configuration change; query frequency is limited according to device load
Traffic observation with port mirroringActual communication flows and protocolsRequires new configuration on the switch; switch load and mirror port capacity are checked in advance
Traffic observation with a TAPTraffic capture on links where mirroring is not possibleThe link is briefly interrupted while the TAP is inserted; it is installed in a maintenance window approved by the plant
Active scanningAdditional device informationCarries risk; only with separate approval and a plan

Prerequisites: what we need to get started

We identify missing information and access together in the first meeting and complete them during the survey.

  • Identifying the lines to be included in the survey
  • An interview schedule with stakeholders
  • An escort and occupational safety briefing for site and cabinet access
  • Read-only access to network devices (if possible)
  • Existing documents (may be incomplete or outdated)
  • A non-disclosure agreement if required

Deliverables

Asset inventory (model, firmware, location)

Logical and physical network diagram

Protocol and data flow map

Prioritised list of findings and risks; points that could not be verified or remain unclear

Roadmap and draft scope of the next project

Management summary presentation

Sample scenario

Representative scenario: mapping the current state before an MES project

Before starting an MES project, the plant wants to know which data can be obtained from its machines and whether the network is ready for it. The survey identifies PLC models and access options, the network structure and existing remote access. The findings go into the technical specification to be given to MES suppliers. The quotes are compared on the same assumptions.

This is a representative consulting flow; it is not a completed customer reference.

Service summary

Related services

IT/OT Integration Consulting

In a new machine, MES or energy monitoring project, we define who owns the network, the data and the access rules.

View details →

Scope limit

The survey is not a penetration test, compliance audit or certification. Machine safety, CE conformity or functional safety (SIL) assessment is outside our scope.

Project approach

How do we proceed?

No step that affects production is carried out until the maintenance window, configuration backup and rollback plan are clear.

01 / STAGE

Preparation

Scope, schedule and access are clarified.

02 / STAGE

Interviews

Stakeholder needs and problems are gathered.

03 / STAGE

Site

Inventory, network and flow information are collected using controlled methods.

04 / STAGE

Analysis

Findings are prioritised.

STAGE 05

Presentation

The report and roadmap are shared with stakeholders.

Frequently asked questions

Questions about the Factory OT Infrastructure Survey

01

Does production stop during the survey?

Interviews, the on-site review and reading existing device records are usually done while production continues. If a new port mirroring configuration or TAP installation is needed, we assess its impact with the plant team and agree on a suitable time. If active scanning is needed, it is planned separately and submitted for your approval.

02

Is the survey paid?

The initial assessment meeting is free of charge. A structured site survey is quoted as a separate service with a defined scope and duration.

03

Can we use the survey report with another company?

Yes. The report and diagrams are prepared impartially; they can also be used if you carry out the implementation with a different integrator.

04

What size of plant is it suitable for?

It can be applied from a single line to multi-building facilities; it is scaled according to scope, number of lines and goals.

Technical survey

Let's plan a technical survey for the factory OT infrastructure

Briefly describe your line, the PLC and network equipment you use and your goal; we will respond with a written proposal covering scope, assumptions and deliverables.

We carry out industrial network assessments on site at plants across Türkiye; passive inventory is collected on site without stopping production, and analysis and reporting are completed remotely. Our service areas.