Factory Network Infrastructure and OT Survey
Before any investment, we record on site which PLCs, switches, protocols and data flows are in use. We list gaps and common points of failure and determine which work should be done first.
Asset inventoryNetwork mapProtocol analysisRisk listRoadmap
What problem does this service solve?
Investing without knowing what is there
Quotes and budgets prepared without knowing how many PLCs there are, which firmware is running or how the network is built get revised halfway through the project.
Lost knowledge
The integrator that did the project has changed, the documents are out of date and the knowledge lives in a few people’s memories.
Unclear priorities
Network renewal, security or data collection? Nobody knows which should come first.
Being unable to compare quotes
Each supplier bases its quote on different assumptions. The quotes cannot be compared.
What we cover, and within what limits
An OT infrastructure survey means identifying the plant’s control systems, networks, communication protocols, data flows and the associated risks on site, using controlled methods. No changes are made to the control program or running configuration during the survey. Information is gathered through interviews, an on-site review, existing records from network devices and traffic observation. Reading from existing records, a new port mirroring configuration and a physical TAP installation are separate operations; the preparation and production impact of each are assessed separately. Active scanning is not used by default: an old PLC’s communication module can lock up from an unexpected scan. If needed, it is planned separately and submitted for approval. The output is an impartial assessment that sets the scope and priorities of the next project and can also be used with another implementer. At the end of the survey, the inventory, topology, open questions and priority findings are handed over.
Technical scope
Stakeholder interviews
Interviews with the production, automation, maintenance and IT teams about goals, problems and planned investments.
Asset inventory
PLCs, HMIs, drives, remote I/O, switches, gateways, servers and engineering workstations; model, firmware and location.
Network and topology
Physical and logical network structure, connection points with IT, remote access paths.
Protocols and data flow
Which system talks to which, with which protocol; existing data collection and integrations.
Risks and findings
Findings regarding continuity, security, maintenance and documentation; prioritised by impact and likelihood.
Roadmap
Quick wins, projects and dependencies; a draft scope for the next step.
Methods used in the survey
| Method | What does it provide? | Preparation and production impact |
|---|---|---|
| Interviews and document review | Goals, known problems, existing projects | No network connection; requires the time of the people involved |
| Site and cabinet review | Physical layout, labelling, environmental conditions | Done with an escort; if cabinets need to be opened, this is planned according to the plant’s occupational safety rules |
| Reading from existing switch records | Connected devices, VLANs, port status, topology | No configuration change; query frequency is limited according to device load |
| Traffic observation with port mirroring | Actual communication flows and protocols | Requires new configuration on the switch; switch load and mirror port capacity are checked in advance |
| Traffic observation with a TAP | Traffic capture on links where mirroring is not possible | The link is briefly interrupted while the TAP is inserted; it is installed in a maintenance window approved by the plant |
| Active scanning | Additional device information | Carries risk; only with separate approval and a plan |
Prerequisites: what we need to get started
We identify missing information and access together in the first meeting and complete them during the survey.
- Identifying the lines to be included in the survey
- An interview schedule with stakeholders
- An escort and occupational safety briefing for site and cabinet access
- Read-only access to network devices (if possible)
- Existing documents (may be incomplete or outdated)
- A non-disclosure agreement if required
Deliverables
Asset inventory (model, firmware, location)
Logical and physical network diagram
Protocol and data flow map
Prioritised list of findings and risks; points that could not be verified or remain unclear
Roadmap and draft scope of the next project
Management summary presentation
Representative scenario: mapping the current state before an MES project
Before starting an MES project, the plant wants to know which data can be obtained from its machines and whether the network is ready for it. The survey identifies PLC models and access options, the network structure and existing remote access. The findings go into the technical specification to be given to MES suppliers. The quotes are compared on the same assumptions.
This is a representative consulting flow; it is not a completed customer reference.
Service summary
IT/OT Integration Consulting
In a new machine, MES or energy monitoring project, we define who owns the network, the data and the access rules.
Scope limit
The survey is not a penetration test, compliance audit or certification. Machine safety, CE conformity or functional safety (SIL) assessment is outside our scope.
How do we proceed?
No step that affects production is carried out until the maintenance window, configuration backup and rollback plan are clear.
Preparation
Scope, schedule and access are clarified.
Interviews
Stakeholder needs and problems are gathered.
Site
Inventory, network and flow information are collected using controlled methods.
Analysis
Findings are prioritised.
Presentation
The report and roadmap are shared with stakeholders.
Questions about the Factory OT Infrastructure Survey
Does production stop during the survey?
Interviews, the on-site review and reading existing device records are usually done while production continues. If a new port mirroring configuration or TAP installation is needed, we assess its impact with the plant team and agree on a suitable time. If active scanning is needed, it is planned separately and submitted for your approval.
Is the survey paid?
The initial assessment meeting is free of charge. A structured site survey is quoted as a separate service with a defined scope and duration.
Can we use the survey report with another company?
Yes. The report and diagrams are prepared impartially; they can also be used if you carry out the implementation with a different integrator.
What size of plant is it suitable for?
It can be applied from a single line to multi-building facilities; it is scaled according to scope, number of lines and goals.
Work that can be planned together
IT/OT Integration Consulting
In a new machine, MES or energy monitoring project, we define who owns the network, the data and the access rules.
OT Cyber Security and Segmentation
We inventory the cells, engineering workstations and external maintenance connections in the production network.
Industrial Network Monitoring and Fault Analysis
For intermittent communication dropouts, we compare PLC and HMI logs, switch counters and downtime records on a single timeline.
Knowledge Center
Technical guides for this service
Let's plan a technical survey for the factory OT infrastructure
Briefly describe your line, the PLC and network equipment you use and your goal; we will respond with a written proposal covering scope, assumptions and deliverables.
We carry out industrial network assessments on site at plants across Türkiye; passive inventory is collected on site without stopping production, and analysis and reporting are completed remotely. Our service areas.