Industrial networks · PLC communication · IT/OT

Industrial Network Installation and PLC Integration

We examine PLC, remote I/O and drive communication on production lines. We plan how machine data will be transferred to SCADA, MES and ERP, and we assess control traffic and data transfer separately.

Siemens S7 / ET200SPPROFINETOPC UAMQTT

01 · PLCSiemens S7 · ET200SP
02 · Industrial networkPROFINET · OPC UA · MQTT
03 · IT/OTSegmentation · field connectivity

OT network architecture

Topology, redundancy, IP/VLAN plan

PLC data integration

Controlling PLC read load and cycle time

Production visibility

Line status, downtime and production tracking

Segmentation and security

Network zones and permitted connections

Our services

Industrial networking and data integration services

Below you will find, one by one, the work needed to renew a production line’s network, track down intermittent communication dropouts or bring machine data into corporate systems.

01 / SERVICE

Industrial Ethernet and Factory Networks

We map switches, cables and connected devices from machine cabinets to the plant backbone.

View details →
02 / SERVICE

PROFINET and PROFIBUS Communication

We investigate intermittent dropouts between PLCs, remote I/O and drives using device diagnostic logs, port counters and the field topology.

View details →
03 / SERVICE

PLC–PLC and PLC–Server Integration

We carry line status and coordination information between PLCs, and monitoring and reporting data between PLCs and servers.

View details →
04 / SERVICE

OPC UA, MQTT and Data Integration

We read the data model a machine exposes via OPC UA and, in projects that need MQTT, distribute this data to applications through a broker.

View details →
05 / SERVICE

SCADA, MES and ERP Connectivity

We identify which system production orders come from and where production quantity and scrap data are generated.

View details →
06 / SERVICE

IIoT and Production Data Collection

We determine the signals and sampling rates needed for production, quality, energy or maintenance.

View details →
07 / SERVICE

OT Cyber Security and Segmentation

We inventory the cells, engineering workstations and external maintenance connections in the production network.

View details →
08 / SERVICE

Industrial Network Monitoring and Fault Analysis

For intermittent communication dropouts, we compare PLC and HMI logs, switch counters and downtime records on a single timeline.

View details →
09 / SERVICE

Edge Gateways and Protocol Conversion

To collect data from machines that use different protocols, we review the existing interfaces, manufacturer support and open data maps.

View details →
10 / SERVICE

IT/OT Integration Consulting

In a new machine, MES or energy monitoring project, we define who owns the network, the data and the access rules.

View details →
11 / SERVICE

Production Monitoring and Dashboards

We show line status on operator screens, recurring stoppages on maintenance screens, and shift and OEE indicators on management screens.

View details →
12 / SERVICE

Industrial Wireless and Mobile Terminals

In warehouse and production areas, we test handheld terminals, forklift displays and mobile equipment along the routes where they are used.

View details →
13 / SERVICE

Factory OT Infrastructure Discovery

Before any investment, we record on site which PLCs, switches, protocols and data flows are in use.

View details →
Where to start?

If you are not sure which service to start with, start with a survey

In a short call, we work out together whether the problem lies in the network, the data, security or the organisation.

Example architecture

How does machine data reach MES and ERP?

PLCs and field devices handle the machine’s control communication. We collect the data needed for monitoring through the existing SCADA, an OPC UA server or a gateway suited to the site. Depending on the project’s needs, the data is transferred to a historian, MES or ERP. We show control connections and corporate data flows separately in the diagram.

OPC UA is a protocol and interface through which a PLC or SCADA exposes data. A gateway is a device or software component that reads and converts different protocols. In projects that use MQTT, the gateway or collection software publishes the data to a broker; applications receive the data by subscribing to the broker.

Not every project requires all of these components. Whether an OT DMZ is needed, and where it is placed, depends on the plant’s network structure and access requirements. Product names are examples and do not imply a manufacturer partnership.

How we work

Survey first, then change

For every change on a live production network, we write down the test steps, configuration backup and rollback path in advance. We apply the change at a time approved by the plant.

01

Discovery and inventory

We build an inventory of PLCs, switches, gateways, protocols and connections from existing records and an on-site review. If a new measurement point is needed, we assess its impact with the plant team.

02

Segmentation and design

Topology, IP plan, access paths and security boundaries; measurable acceptance criteria.

03

Controlled implementation

Test window, configuration backup, rollback plan and change record.

04

Monitoring and improvement

Documentation, alarms, performance tracking and sustainable maintenance.

Why Eretek?

Automation field and IT infrastructure at the same table

After establishing communication, we also hand over the monitoring settings, configuration backups and maintenance documentation. We apply our experience in corporate networking, systems and security together with the priorities of the production floor.

In the first meeting

We look for answers to three clear questions

?

Where does it break?

In the PLC, network, gateway, application or data consumption layer?

?

How critical is it?

How large are the risks of production downtime, data loss and access?

?

What is the goal?

Stable communication, data visibility or corporate integration?

Frequently asked questions

Most frequently asked before a proposal

01

Is PROFINET the same as regular Ethernet?

No. PROFINET is a protocol that runs on Ethernet infrastructure and is designed for the real-time communication needs of industrial automation. Not every Ethernet switch or topology is suitable for every PROFINET application; RT, IRT or TSN support is verified separately for each device.

02

Can every PLC send data directly to a Linux server?

The same method does not apply to every PLC and firmware. Supported protocols, access licences, network permissions and data requirements are checked, and OPC UA, Modbus TCP, suitable S7 access or a gateway is chosen accordingly.

03

Should we connect the PLC directly to the ERP?

In most scenarios, a manageable data integration layer with audited security and an OT DMZ is preferred over a direct connection. The responsibilities of the control network and business applications should be kept separate.

04

Can the work be done without stopping current production?

Reviewing existing records and some passive observation can usually be done while production continues. If a new measurement point has to be installed or the control network has to be changed, we assess the impact with the plant team and agree on a suitable time.

05

Do you do PLC programming?

We do not develop PLC application software. Our focus is communication, networking, data integration and OT network security. Any changes needed on the PLC side are coordinated with the plant’s automation team or the machine manufacturer.

Across Türkiye

Industrial network projects across Türkiye

We deliver industrial network and PLC/OT integration projects at production sites across Türkiye. Passive inventory, site surveys and commissioning are done at the plant during maintenance windows that fit the production schedule. Monitoring and approved configuration changes are handled over secure remote access. Our service areas.

Technical survey

Let's discuss the right architecture for your production network

Let’s plan a technical survey based on your current situation, installed equipment and goals. The first meeting is free of charge; scope and deliverables are set out in a written proposal.