Use cases

Solutions for factories and production facilities

In automotive supply, metalworking, machine building, food and logistics sites, the same six problems come up again and again. Below are the typical steps for each and the services involved.

Representative scenariosNot customer references

01 / SCENARIO

Renewing the network of an existing line

A line that has grown through additions over the years, running on unmanaged switches and undocumented cabling. A single loop can stop the whole cell. The migration is carried out in phases while protecting production.

02 / SCENARIO

Bringing PLC data to a server

Part counts, downtime, energy and process data are moved to a server without touching the PLC cycle, read-only and through a single collection point. Having every client query the PLC separately is a risk.

Typical steps

  • PLC model, firmware and licence inventory
  • Approved data contract
  • Choosing OPC UA / Modbus TCP / S7 access
  • Edge buffering and disconnection tests

Related services

View details →
03 / SCENARIO

Production outage analysis

Intermittent dropouts, packet loss, loops and configuration errors are told apart using the alarm timeline, port counters and passive traffic analysis. Evidence, not guesswork.

Typical steps

  • Event timeline
  • Port error counters and diagnostic buffers
  • Passive capture via port mirroring / TAP
  • Evidence-based root cause report

Related services

View details →
04 / SCENARIO

Secure remote maintenance access

If manufacturers connect via modems and always-on VPNs, nobody knows who accessed what and when. The goal: single-point, authenticated, time-limited and logged access.

Typical steps

  • Inventory of existing remote connections
  • Jump host in the OT DMZ
  • Zone access per supplier
  • Controlled shutdown of legacy connections

Related services

View details →
05 / SCENARIO

Multi-vendor equipment integration

Machines from different manufacturers and generations speak different protocols. With edge gateways and a standard data model, they all meet in a single data layer.

Typical steps

  • Protocol and address map analysis
  • Gateway technical criteria
  • Naming and unit standard
  • Value validation and gateway management

Related services

View details →
06 / SCENARIO

Live production dashboards

Line status, downtime reasons, OEE and energy indicators become separate dashboards for operators, maintenance and managers, based on validated data. An indicator that drives no decision just takes up space.

Typical steps

  • Role–decision–indicator matrix
  • Written OEE definitions
  • Validation against manual records
  • Alerts and line screens

Related services

View details →
Technical survey

Is your scenario different?

Briefly describe your line, your installed equipment and the problem you are facing. Let’s decide on the right starting point together.